Certificate of technical competence
Our company reports that the production control system complies with the requirements of TKP 45-1.01-221-2010 and provides the ability to test and control the quality of products:
- Electrical installation works (installation of networks and power supply systems, electric lighting);
- Installation of communications and dispatching of engineering equipment;
- Installation of automation systems;
- Installation of low-current networks and systems;
- Linear cable structures of telecommunications;
- Installation of passive optical networks.